1

Solution to Example Intermediary Exam

1D

SCM is integrating the flow of materials, information and customers between the organization and its suppliers and customers.

2A

Operations Strategy is about making a prioritization between the five key performance measures (Cost, Quality, Speed, Dependability and Flexibility). Answers B and D are not getting into these KPIs and are therefore wrong. Clearly, for INPHONE Flexibility is more important than Cost.

3C

Arrival rate is  10  jobs per hour, capacity is  12  jobs per hour, i., utilization is 10/12.

4D

Clearly throughput is a capacity which should not be confused with the throughput time. Throughput is determined by the bottleneck. Here the bottleneck is Coating which can handle  6  jobs per hour.

5B

See Slide  32  of Lecture  2 

6B

See Slide  38  of Lecture  3 

7A

Balking: upon arrival customer examines queue and decides to leave right away Reneging: Customer enters queue and at certain point reaches the conclusion that (s)he leaves the system.

8C

See Slide  43  of Lecture  3 

9D

Arrival rate is  12  customers per hour. Throughput time is 5+15+10 =  30  minutes = 0 hour. According to Little’s equation it holds that the WIP is equal to  12  x 0 = 6.

10D

Arrival rate = 60/7 = 8. Activity A capacity =  3  x (60/26) = 6. Activity B capacity = 60/8 = 7. Activity C capacity =  2  x (60/18) = 6.

2

11C

Design capacity =  120  hours/week x  1200  tablets/hour = 144,000 tablets/week Planned breaks etc are  12  hours per week, i., Effective capacity = (120 – 12) x  1200  = 129, Actual output = 116, Utilization = Actual output / design capacity = 116,640/144,000 = 81% Efficiency = Actual output / Effective capacity = 116,640/129,600 = 90%.

12C

Arrival rate is  12  jobs per hour At Activity 1,  9  jobs can be done in  15  + (9 x 5) =  60  minutes, i.,  9  jobs per hour At Activity 2, at 2a the capacity is  4  jobs/hour and at 2b it is  6  jobs per hour, i., in total  10  jobs per hour The bottleneck is Activity  1  and the throughput is  9  jobs per hour. Again, throughput is a capacity which should not be confused with the throughput time.

13B

M/M/

λ = 60/17; μ = 60/

1.

()

Wq

 



14D

M/M/

λ = 60/ μ = 11 per 3 hours = 11/3 per hour utilization = λ/μ = 0.

15A λ=1/2 = 0 units/minute and μ=3 units/minute M/M/1 model

(  )

Wq = 0 minutes

16A

λ= 60/6 = 10 customers/hour μ = 60/4 = 15 customers/hour M/D/1 model

2 ( )

2

 

Lq =0 customers

17B

Was dit document nuttig?

Exam 2015, Answers rn

Vak: Operations and Logistics Management (EBB068A05)

137 Documenten
Studenten deelden 137 documenten in dit vak
Was dit document nuttig?
1
SolutiontoExampleIntermediaryExam
1D
SCMisintegratingtheflowofmaterials,informationandcustomersbetweenthe
organizationanditssuppliersandcustomers.
2A
OperationsStrategyisaboutmakingaprioritizationbetweenthefivekeyperformance
measures(Cost,Quality,Speed,DependabilityandFlexibility).AnswersBandDarenot
gettingintotheseKPIsandarethereforewrong.Clearly,forINPHONEFlexibilityismore
importantthanCost.
3C
Arrivalrateis10jobsperhour,capacityis12jobsperhour,i.e.,utilizationis10/12.
4D
Clearlythroughputisacapacitywhichshouldnotbeconfusedwiththethroughputtime.
Throughputisdeterminedbythebottleneck.HerethebottleneckisCoatingwhichcan
handle6jobsperhour.
5B
SeeSlide32ofLecture2
6B
SeeSlide38ofLecture3
7A
Balking:uponarrivalcustomerexaminesqueueanddecidestoleaverightaway
Reneging:Customerentersqueueandatcertainpointreachestheconclusionthat(s)he
leavesthesystem.
8C
SeeSlide43ofLecture3
9D
Arrivalrateis12customersperhour.Throughputtimeis5+15+10=30minutes=0.5hour.
AccordingtoLittle’sequationitholdsthattheWIPisequalto12x0.5=6.
10D
Arrivalrate=60/7=8.57
ActivityAcapacity=3x(60/26)=6.92
ActivityBcapacity=60/8=7.5
ActivityCcapacity=2x(60/18)=6.67.