Dpwh cost estimate guidelines

DPWH ESTIMATE
Course

Bachelor of Science in Civil Engineering

184 Documents
Students shared 184 documents in this course
Academic year: 2011/2012
Uploaded by:
0followers
1Uploads
34upvotes

Comments

Please sign in or register to post comments.
  • Student
    Thanks
  • Student
    Thanks for this man! It helps!
  • MS
    A very significant document in the preparation of Program of Works.

Related Studylists

Educational

Preview text

EQUIPMENT OUTPUT/DAY

BASIC ASSUMPTIONS:

  1. Average output of Road Roller (12 passes) 360 m 3 /day (FLAT) (Vibratory Roller) 300 m 3 /day (ROLLING & MOUNTANOUS)
  2. Average output of Road Grader 400-500 m 2 /day
  3. Average output of Asphalt Distributor 2,400 m 2 /day
  4. Average output of Transit Mixer 30 m 3 /day (8 trips – 4 cu. m. cap)
  5. Average output of one gang

For clearing & grubbing 4,000 m 2 /day

a. Road Grader b, Payloader c. Dumptruck (min. of 2 units)

  1. Average output of one gang

For Removal of Dilapidated PCCP 100-200 m 2 /day

OPTION NO. 1 (USE 100 M 2 /DAY)

a. Jackhammer b, Payloader c. Dumptruck

OPTION NO. 2 (USE 200 M 2 /DAY)

a. Backhoe with Concrete Breaker or Pencil Hammer b. Payloader c. Dumptruck (min. of 2 units)

  1. Average output of one gang

For surplus common excavation 400-500 m 3 /day (full excavation)

a. Bulldozer D b. Payloader c. Dumptruck (min. of 2 units)

  1. Average output of one gang

For Embankment 300-400 m 3 /day (emb. from road cut) add dozer

a. Road Grader base from HD (if embankment from other source) no b. Payloader bulldozer c. Dumptruck d. Road Roller e. Water Truck

  1. Average output of one gang

For Sub-grade preparation 2,400 m 2 /day a. Road Grader b. Vibratory Roller c. Water Truck

  1. Average output of one gang

For Agg. Sub-base course 300-400 m 3 /day

a. Road Grader flat = 400 m 3 /day b. Road Roller rolling = 350 m 3 /day c. Water Truck mountainous = 300 m 3 /day

  1. Average output of one gang

For Agg. Base course 300-400 m 3 /day

a. Road Grader flat = 400 m 3 /day b. Road Roller rolling = 350 m 3 /day c. Water Truck mountainous = 300 m 3 /day

  1. Average output of one gang

For Bituminous Conc. Surface course 2,249 m 2 /d (0 thk.) verify maintenance 1,500 m 2 /day (0 thk.) verify maintenance

a. Asphalt Paver b. Steel Roller c. Pneumatic Roller

  1. Average output of one gang

For PCCP (transit mixer) 90 m 3 /day (0 thk.) 90 m 3 /day (0 thk.) a. Transit Mixer (3 units) b. Payloader c. Concrete Vibrator d. Batching Plant e. Water Truck with pump

For PCCP (1 – bagger mixer) 8 – 10 m 3 /day

  1. Average output of one gang

For Structural Conc. Class A 27 m 3 /day

a. Transit Mixer (3 units) b, Payloader c. Concrete Vibrator d. Batching Plant e. Water Truck w/ pump

Using 1 – Bagger Mixer 6 – 8 m 3 /day

  1. Average output of Backhoe 150 m 3 /day

  2. Average output of Crane Clamshell 150 m 3 /day (with back-up equip’t. Below)

  3. Average output of Bulldozer 350 m 3 /day (D6) 500 m 3 /day (D7)

  4. Average output of Dredger 80 m 3 /day (10”) 200 m 3 /day (12”)

HAULING OF AGGREGATES DATA

FLAT ROLLING MOUNTAINOUS

SPEED (KPH)

W/ LOAD

W/O LOAD

30.

30.

20.

30.

15.

25.

CAPACITY (M 3 )

5.

10.

4.

6.

3.

4.

NO. OF DT 1 1 1.

ITEM 202: Flat = 12 m Rolling = 8 m Mountainous = 6 m

FURNISHING OF AGGREGATES

A. HAULING:

  1. Stockpiling and loading use: 1 – 7 Bulldozer, capacity = 500 m 3 /day use: 1 – Payloader, capacity = 500 m 3 /day P 9,258/day + P 4,662/day Unit Cost = ------------------------------------------------ = P 27/m 3 500 m 3 /day
  2. Hauling Cost Average Haul Distance = 5 KM. Average truck speed per day = 25 KPH 2 x 5 x 60 kph Travel time = ------------------------------------------------- = 24 mins. 25 kphLoading, unloading & shifting time = 20 mins.Total cycle time 44 mins.

8 X 60 (83% eff.) No. of trips/day = ------------------------------------------- = 9 say 9 trips 44 mins.

P 6,024/day Unit Cost = ------------------------------------------ = P 66/m 3 9 x 10 m 3 /truck

  1. Excise Tax (3% of items 1 & 2) = P 2/m 3
  2. Royalty access road Prov’l. & Brgy. Tax = P 15/m 3Hauling Cost P 112/m 3

B. PROCESSING: 1. Fine Aggregates P 3,198 + P 304 + P 220. Screening = ------------------------------------------------- = P 24/m 3 150 m 3 /day

P 3,198 + P 304 + P 220. Washing = ------------------------------------------------- = P 18/m 3 200 m 3 /day ========== P 43/m 3 FA = P 112/m 3 + P 43/m 3 = P 156/m 3 2. Coarse Aggregate P 3,198 + P 304 + P 220. Screening = ------------------------------------------------- = P 37/m 3 100 m 3 /day

P 3,198 + P 304 + P 220. Washing = ------------------------------------------------- = P 18/m 3 200 m 3 /day ========== P 55/m 3 CA = P 112/m 3 + P 55/m 3 = P 168/m 3

  1. Sub – base course P 3,198 + P 304 + P 220. Screening = ------------------------------------------------- = P 14/m 3 250 m 3 /day P 3,198 + P 304 + P 220. Screening = ------------------------------------------------- = P 24/m 3 150 m 3 /day

P 3,198 + P 304 + P 220. Blending = ------------------------------------------------- = P 12/m 3 300 m 3 /day ==========

P 37/m 3

200 (Processed) = P ( 112 + 14 ) m 3 /day= P 127/m 3 201 (Processed) = P ( 112 + 37 ) m 3 /day= P 149/m 3

FURNISHING OF AGGREGATES

A. HAULING:

  1. Stockpiling and loading use: 1 – 7 Bulldozer, capacity = 500 m 3 /day use: 1 – Payloader, capacity = 500 m 3 /day P 9,258/day + P 4,662/day Unit Cost = ------------------------------------------------ = P 27/m 3 500 m 3 /day
  2. Hauling Cost (Source = unknown) Average Haul Distance = 5 KM. Average truck speed per day = 25 KPH 2 x 5 x 60 kph Travel time = ------------------------------------------------- = 24 mins. 25 kphLoading, unloading & shifting time = 20 mins.Total cycle time 44 mins.

8 X 60 (83% eff.) No. of trips/day = ------------------------------------------- = 9 say 9 trips 44 mins.

P 6,024/day Unit Cost = ------------------------------------------ = P 66/m 3 9 x 10 m 3 /truck

  1. Excise Tax (3% of items 1 & 2) = P 2/m 3
  2. Royalty access road Prov’l. & Brgy. Tax = P 15/m 3Hauling Cost P 112/m 3

B. PROCESSING: 1. Fine Aggregates P 3,198 + P 304 + P 220. Screening = ------------------------------------------------- = P 24/m 3 150 m 3 /day

P 3,198 + P 304 + P 220. Washing = ------------------------------------------------- = P 18/m 3 200 m 3 /day ========== P 43/m 3 FA = P 112/m 3 + P 43/m 3 = P 156/m 3 2. Coarse Aggregate P 3,198 + P 304 + P 220. Screening = ------------------------------------------------- = P 37/m 3 100 m 3 /day

P 3,198 + P 304 + P 220. Washing = ------------------------------------------------- = P 18/m 3 200 m 3 /day ========== P 55/m 3 CA = P 112/m 3 + P 55/m 3 = P 168/m 3

  1. Sub – base course P 3,198 + P 304 + P 220. Screening = ------------------------------------------------- = P 14/m 3 250 m 3 /day P 3,198 + P 304 + P 220. Screening = ------------------------------------------------- = P 24/m 3 150 m 3 /day

Item 201 – Agg. Base Course = P(78 + 57 + 38)m 3 /day = P 175/m 3

ASSOCIATION OF CARRIERS & EQUIPMENT LESSORS INCORPORATED

D E S C R I P T I O N R A T E / D A Y

TYPE OF EQUIPMENT As of 1998 75%

1. BULLDOZER

D – 9

D – 8

D – 7

D – 6

D – 4

2. LOADER

3 cu. m. 2 cu. m. 1 cu. m. 3. GRADER 4. ROAD ROLLER, 105 H. 5. PNEUMATIC ROLLER, 107 H. 6. VIBRATORY ROLLER , 100 H. 7. SHEEPFOOT ROLLER 8. CRANE, CRAWLER TYPE, 71 – 80 tons 9. CRANE, CRAWLER TYPE, 21 – 25 tons 10. CRANE, TRUCK MTD. TYPE, 21 – 25 tons 11. CRANE, TRUCK MTD. TYPE, 2 – 5 tons 12. BACKHOE, ½ CU. M. 13. PILE HAMMER, M 14. DROP HAMMER, 2 TONS 15. PILE VIBRA. HYD. DRIVEN, 45,000 KG – M 16. ASPHALT DISTRIBUTOR, 5 TONS, 3000 USG 17. ASPHALT PAVER 18. CONCRETE PAVER 19. CONCRETE MIXER, 1 – 2 BAGGER 20. CONCRETE TRANSIT MIXER, 5 – 8 CU. YDS. 21. DUMPTRUCK 5 CU. M./LOAD (AVE.) 10 CU./LOAD (AVE.) 22. AIR COMPRESSOR 23. WATER PUMP ( 4” DIA.) 24. WATER TRUCK (500 – 1000 GALS.) 25. WELDING MACHINE GAS DRIVEN, 400 AMP. ELECTRIC DRIVEN, 400 AMP. 26. CONCRETE BATCH PLANT (40 1PH) 27. AGGREGATE CRUSHER, 100 TPIL 28. ASPHALT BATCH PLANT, 100 TPH 29. STAKE TRUCK, 2 – 5 TONS 30. CONCRETE VIBRATOR 31. CONCRETE CUTTER 32, L. BED 4/TON/KM L. BED 4/TON/KM 33. BAR CUTTER, 350 – 450 KG./DAY 34. CHAINSAW, 18” BAR LENGTH, 8 H.

P 20,248 /day P 18,809 /day P 12,344 /day P 10,176 /day P 5,328 /day

P 8,328 /day P 6,216 /day P 4,264 /day P 6,368 /day P 4,120 /day P 4,216 /day P 11,184 /day P 2,488 /day P 23,376 /day P 10,064 /day P 9,296 /day P 3,552 /day P 9,656 /day P 7,592 /day P 600 /day P 22,320 /day P 6,808 /day P 6,808 /day P 10,464 /day P 1,384 /day P 8,528 /day

P 4,952 /day P 8,032 /day P 4,472 /day P 305 /day P 7,744 /day

P 465 /day P 240 /day P 16,635 /day P 373,571 /day P 39,235 /day P 4,824 /day P 265 /day P 308 /day P 4/ton/km. P 4/ton/km. P 200 /day P 195 /day

P 15,186 /day P 14,106 /day P 9,258 /day P 7,632 /day P 3,996 /day

P 6,246 /day P 4,662 /day P 3,198 /day P 4,776 /day P 3,090 /day P 3,162 /day P 8,388 /day P 1,866 /day

P 7,548 /day P 6,972 /day P 2,664 /day P 7,242 /day P 5,694 /day P 450 /day P 16,740 /day P 5,106 /day P 5,106 /day P 7,848 /day P 1,038 /day P 6,396 /day

P 3,714 /day P 6,024 /day P 3,354 /day P 229 /day P 5,808 /day

P 349 /day P 180 /day P 12,476 /day P 280,178 /day P 29,426 /day P 3,618 /day P 199 /day P 231 /day P 3/ton/km. P 3/ton/km. P 150 /day P 146 /day

  1. DRILLING RIG HYD CRAWLER, 2000 mm dia.
  2. DRILLING RIG HYD CRAWLER, 1800 mm dia.
  3. DRILLING RIG MECH. ROTARY,600-2000 MM

P 91,904 /day P 86,072 /day P 27,976 /day

P 68,928 /day P 64,554 /day P 20,982 /day

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

COST ESTIMATE GUIDELINES

ITEM 100 : CLEARING AND GRUBBING

  1. Light - 50 sq. m,/man-day
  2. Medium - 25 sq. m./man-day
  3. Dense a. 65 sq. m./man-day b. With Chainsaw – 200 sq. m./man-gang/day
  4. Individual removal of trees up (Up to max. of 0 m. dia.) a. 1 Tree per man-day b. With Chainsaw – 10 trees/2-man gang/day

Note: The above outputs are up to maximum disposal site distance of 10 meters.

ITEM 101 : REMOVAL OF STRUCTURES AND OBSTRUCTIONS

Daily Output Reinf. Conc. Conc. Pvmnt. Asp. Pvmnt. A. Labor/MD 0 cu. m. 2 sq. m. 8 sq. m. B. Equipment

2 cu. m. 50 sq. m.

B Air Comp. w/ Jackleg B Road Grader Open – 2,400 sq. m. Limited – 1,200 sq. m.

C. Removal of Slides

Using Payloader:

Disposable Distance (meter)

Capacity per day (cu. m.) Rock Common Earth 7 300 430 10 270 390 20 230 330 25 200 280 30 180 260 40 160 230 45 150 220 50 140 210 55 130 190 60 120 170

Note: 1. Open refers to traffickless working condition. 2. Beyond 60 meters use dumptruck for disposal of waste. 3. For A and B consider cost of waste disposal.

ITEM 102 : EXCAVATION

ITEM 104 : EMBANKMENT

A. Shrinkage/Swell factor – 20% (for common borrow only)

B. Placing

B. Labor: Daily output in cu. m./man-day for common earth and unclassified material = 4 cu. m./man-day B. Equipment: Output of 1 unit Road Grader – 600 cu. m./day (400 cu. m./day)

C. Compaction:

C. Labor (Tamping): 2 cu. m./man-day (applicable to backfills for cross drain or Retaining walls).

C. Equipment: Portable plate compactor : 50 cu. m./day 1 Tonner Road Roller : 100 cu. m./day 9 -11 Tonner Road Roller : 300 cu. m./day (400 cu. m./day)

Note: 1. Duration for the Water Truck is equal of the duration of the Road Roller. 2. Ratio of one (1) Road Grader to two (2) Road Rollers. 3. Number of Dump Trucks per day depends on capacity of Road Grader per day. I

TEM 105 : SUBGRADE PREPARATION

A. Equipment (using motorized Road Grader)

A Reshaping and Grading

Grader = 2,500 sq. m./day Roller = 2,500 sq. m./day

Preparation of dirth/earth road or application of gravel.

Item 200 or Item 201 or 300 = 12,500 sq. m./day

Preparation of gravel road for the construction of

Asphalt Concrete Pavement = 9,000 sq. m./day.

A Compaction

Required duration for road Roller is the same that of the Road Grader and the

duration of Water Truck is half the duration for the Roller.

SPL. AGGREGATE HAULING/TIMESPOTTING

A. Quarrying:

Output of one (1) D4 Bulldozer - 210 cu. m./day of unprocessed material

B. Screening and Stockpiling: (Refer to the following formula)

General Formula:

For Wheel Loaders:

Q = q x ( 60/CM ) x E

Where: Q = hourly production in cu. m./hr. q = production per cycle in cu. m. CM = cycle time in minutes E = job efficiency q = ql x k ql = heaped capacity of loader k = bucket factor

Cycle time for Loader (cm)

  1. In a cross loading

Cm = D/F + D/R + Z

  1. For a V – shaped loading

Cm = D/F + 2 + D/R + 2 + Z

  1. In load and carry

Cm = D/F x 2

Where: Cm = cycle time in minutes D = hauling distance F = forward speed in meters/minute R = reverse speed in meters/minute Z = fixed time (minutes) – sum of gear shifting, Loading, turning and waiting time

FIXED TIME: V – Shaped Loading

Cross Loading

Load and Carry Direct Drive 0 0. Hydraulic Drive 0 0. Torque Flow Drive 0 0 0. Travel Speed: F1 = (0 – 7 km/hr) R1 = (0 – 7 km/hr)

  • Computation for screening and stockpiling for wheel loaders (articulated) Use job efficiency ( E ) of 0 (83%) Cm = 1 min. (cycle time for screening 1 bucket of unprocessed material)

Q = q x (60/cm) x E; use q = use truck bucket capacity Q x (60/1) x (0) = 49 q cm/hr.

Where q is the struck bucket capacity

However, for screening fine and course aggregates, introduce (f) quarry factors to the general formula, therefore.

  1. Screening fine aggregates Q = 49 qFc (cu./hr.)
  2. For screening coarse aggregates Q = 49 qFc (cu. m./hr.)

Moreover, in the screening process of fine and coarse aggregates, there is extra time required for stockpiling and screened waste. Materials which needs to be determined as a factor of cycle time to be multiplied to the above formula to arrive azt the output capacity, Q.

Sample Problem:

Given: q = 1 cu. m. Quarry productivity: F. = 60%

Screening time = 11.67/1 x 1 min. = 7 min. Stockpiling time (for 7 cu. m.) = 4 min. Removal of Waste = 4 cu. m. x 1 min. = 4 min. Total time per cycle = 17 min. Total no. of cycle in one hour = 60/17 = 3. Hourly production = 3 x 7 cu. m. = 24 cu. m. Daily production = 24 x 6 hrs. = 148 cu. m.

In one hour, the equipment is assumed to work only for 45 minutes, hnce it works only for 6 hours in a day. C. Loading and Unloading

C Loading and Unloading Time:

a. Using payloader and dumptrucks:

  1. Aggregates: a. Loading Time = 5 mins. a Unloading time = 1 min. a. Slack Time = 2 mins. – 6 mins.

Depending on the availability on location of maneuvering area:

  1. Boulders – 6 minutes

b. Manual Loading (crew of 6 Laborers to fill 1 unit)

C Capacity of 1 unit dumptruck: -5 cu. m. - 1 hr.

D. Speed of Dumptruck:

Speed in KPH Below 7% Grade 7 -12% Above 12% Dirt Road Paved Dirt Road Paved Paved Loaded Trip 15 25 10 15 5 W/o Load 20 30 15 20 10

E. Stockpiling of Boulders:

E.1 side slope: (Barring down and stockpiling)

Labor Capacity – 2 cu. m./MD

E.2 and stockpiling from riverbed

Labor Capacity – 2 cu. m./MD

ITEM 200 : AGGREGATE SUB-BASE COARSE

ITEM 201 : AGGREGATE BASE COARSE

A. Shrinkage Factor – 15%

B. Spreading capacity of 1 unit road grader – 600 cu. m./day

C. Compacting capacity of 1 unit road roller – 300 cu. m./day

Duration of water truck is equal to the duration of road grader. Equiment proportion is 1 unit road grader to 2 units road roller.

D Labor/Supervision

1 – Civil Engineer 1 – Lab. Tech. 1 – Foreman 1 – Helper/Laborer for every equipment except for 2 – Flagmen (Optional) Dumptrucks and Rollers

ITEM 311 : PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

A. Materials:

A. 9 -10 bags of cement per cu. m. of concrete

A. Aggregates:

Loose Volume Qty. per cu. m. of concrete Fine Aggregates: 0 cu. m. (0 – 0 cu. m.) Coarse Aggregates: 0 cu. m. (0 – 0 cu. m.)

Include other miscellaneous accessories e. dowel bars, joint fillers, etc.

B. Batching and Casting in – place:

B Using 2 units 1 -= bagger mixer (minimum)

a. Capacity = 180 bags/day (i. 90 bags per 1 bagger concrete mixer) (70 bags : presently being adopted)

b. Crew members: (for 20 cu. m. PCCP)

1 – Civil Engineer 4 – Masons 1 – Material Engineer 2 – Carpenters 1 – Laboratory Technician 24 – Laborers 1 – Foreman

c. Equipment support for 2 units 1 – bagger mixer

c. Consider water provision c. 2 – portable concrete vibrator c. 1 – bar cutter c. 1 – concrete cutter

B. Using Transit Mixer (3 cu. m.)

  1. For no. of trips/day, apply time spotting (maximum distance of batching plant)

  2. Crew at batching plant

4 – Laborers 1 – Materials Lab. Tech.

  1. Crew at project site:

1 – Civil Engineer 1 – Material Engineer 1 – Foreman 1 – Material Lab. Tech. 2 – Masons 10 – Laborers 2 – Carpenters

  1. Equipment Requirement:

C ( 3 ) 9 0 0.

D ( 4 ) 11 0 0.

B. Batching and Casting in – place

B. The duration for 1 – bagger or 2 – bagger mixer depends on equipment utilization schedule as reflected in the PERT/CPM. B.. Crew for 1 – bagger mixer and transit mixer is the same as Item 311 except for steelman which is included in Item 404 and carpenters which is revised per section D of this item. B. Supporting equipment for batching plant same as Item 311. B. Duration of transit mixer is dependent on the speed setting forms and type and size of structures. (See B.)

C. Curing:

C. Either ponding or use of curing compound or combination or both as specified in the Std. DPWH Specs.

D. Formworks:

D. Formworks:

Minimum Crew Composition:

1 – Civil Engineer 2 – Carpenters 1 – Construction Foreman 4 – Laborers

Capacity:

  1. Fabrication and Installation = 35 sq. m./day
  2. Stripping = 60 sq. m./day

D. Scaffolds for Bridges:

Materials:

27 bd. ft. per meter height per meter span

ITEM 500 : PIPE CULVERTS AND STORM DRAINS

A. Scope of Works: Laying and Collaring. Backfilling shall be Item 104.

B. Size of RCCP Capacity of crew per day

300 mm 24 pcs. 450 mm 12 pcs. 610 mm 8 pcs.

Crew Composition:

1 – Civil Engineer 1 – Mason 1 – Foreman 6 – Laborers

With equipment support 1 unit chain block with stand

ITEM 504 : GROUTED RIPRAP

(Proportion of grout mix = 1 part cement to 3 parts sand)

A. Scope of Works:

A. Laying of boulders and grouting A. Curing A. Foundation preparation and excavation A. Provision of weepholes A. Double or multiple handling, if necessary should be derived

B. Labor:

Crew Composition: (minimum)

1 – Civil Engineer 2 – Skilled Laborer 1 – Foreman 6 – Laborers 1 – Materials Lab. Tech. B. Preparation of foundation i. excavation:

Labor capacity – See Item 103: Structure Excavation For capacity of laborers.

Crew Composition:

1 – Civil Engineer 1 – Foeman 10 – Laborers

Capacity of gang = 18 cu. m./man – day (this capacity is based on the assumption that all materials are within reach of the laborers.)

C. Materials:

C. Boulders – equal to volume of grouted riprap C. Cement – 2 bags per volume of grouted riprap C Sand – 25% 0f volume of grouted riprap – 0/cu. m.

D. Water provisions:

Consider source or availability of water at site.

ITEM 505 : STONE MASONRY

(Proportion of mortar mixture – 1 part cement to 2 parts and by volume)

A. Scope of Work:

The same as Item 504, Grouted Riprap

B. Labor: Laying of boulders, grouting, curing and installation of weepholes. Minimum Crew Composition:

1 – Civil Engineer 6 – Skilled Laborers 1 – Construction Foreman 12 – Laborers 1 – Materials Lab. Tech.

Capacity of Gang – 13 cu. m./man-day Capacity of Laborers – 0 to 1 cu. m. per man-day or an average of 0. cu. m. per man-day.

C. Materials:

C. Portland Cement: 5 bags per cu. m. of stone masonry

GUIDELINES FOR INDIRECT COST

(1) Pre – Construction Engineering (PCE)

PROJECT

COST

% of TEPC Flat Terrain Rolling Terrain Mountainous New Rehab New Rehab New Rehab 0 ~ 1 M 1 0 1 0 2 1. 1 M ~ 2 M 0 0 1 0 2 1. 2 M ~ 5 M 0 0 1 0 2 1. 5 M ~ 0 0 0 0 1 0. TEPC: Total Estimated Project Cost

(2) Tool

Not to exceed five percent (5%) of TEPC

(3) Project Superintendence

Not to exceed five percent (5%) of TEPC

(4) Engineering and Administrative Overheads

Three percent of TEPC

(5) Material Testing Cost (Quality Control)

Project Cost % of TEPC 0 ~ 0 M 1. 0 M ~ 0 M 1. 0 M ~ 0 M 0. 0 M ~ 2 M 0. 2 M ~ 5 M 0. 5 M ~ 0.

(6) Contractor’s Overhead/Profits (Refer to D. No. 30 Series of 1991, January 30, 1991) Project Cost

% of Construction Cost OCM Profit Mob/Demob Total 0 ~ 1 M 13 15 2 30 2 M ~ 5 M 12 14 2 28 5 M ~ 10 M 12 13 2 27 10 M ~ 20 M 11 12 (separate) 23 20 M ~ 50 M 11 11 (separate) 22 50 M ~ 10 10 (separate) 20 OCM: Overhead, Contingency, Miscellaneous

(7) Contract Tax (VA)

Ten percent (10%) of Estimated Direct Cost (EDC)

(8) Around 0 ~ 10% of Total Direct Cost

DEPARTMENT ORDER

NO. 57

Series of 2002

ESTIMATED

DIECT COST (EDC)

INDIRECT COST %

FOR OCM AND PROFIT

(maximum ranges)

% COST FOR

MOB./DEMOB.

(maximum)

TOTAL

MAXIMUM

INDIRECT

COST % FOR

OCM, PROFIT

AND MOB./

OCM DEMOB.

(% of EDC)

PROFIT

(% of EDC) Up to P 1 Million 13 15 1 29 Above 1 M to 5 M 12 14 1 27 Above 5 to 10 M 12 13 1 26 Above 10 M to 20 M 11 12 1 24 Above 20 M to 50 M 11 11 1 23 Above 50 M 10 10 1 21

Was this document helpful?
This is a Premium Document. Some documents on Studocu are Premium. Upgrade to Premium to unlock it.

Dpwh cost estimate guidelines

Course: Bachelor of Science in Civil Engineering

184 Documents
Students shared 184 documents in this course
Was this document helpful?

This is a preview

Do you want full access? Go Premium and unlock all 20 pages
  • Access to all documents

  • Get Unlimited Downloads

  • Improve your grades

Upload

Share your documents to unlock

Already Premium?
EQUIPMENT OUTPUT/DAY
BASIC ASSUMPTIONS:
1. Average output of Road Roller (12 passes) 360 m3/day (FLAT)
(Vibratory Roller) 300 m3/day (ROLLING & MOUNTANOUS)
2. Average output of Road Grader 400-500 m2/day
3. Average output of Asphalt Distributor 2,400 m2/day
4. Average output of Transit Mixer 30 m3/day (8 trips – 4 cu. m. cap)
5. Average output of one gang
For clearing & grubbing 4,000 m2/day
a. Road Grader
b, Payloader
c. Dumptruck (min. of 2 units)
6. Average output of one gang
For Removal of Dilapidated PCCP 100-200 m2/day
OPTION NO. 1 (USE 100 M2/DAY)
a. Jackhammer
b, Payloader
c. Dumptruck
OPTION NO. 2 (USE 200 M2/DAY)
a. Backhoe with Concrete Breaker or Pencil Hammer
b. Payloader
c. Dumptruck (min. of 2 units)
7. Average output of one gang
For surplus common excavation 400-500 m3/day (full excavation)
a. Bulldozer D7
b. Payloader
c. Dumptruck (min. of 2 units)
8. Average output of one gang
For Embankment 300-400 m3/day (emb. from road cut) add dozer
a. Road Grader base from HD (if embankment from other source) no
b. Payloader bulldozer
c. Dumptruck
d. Road Roller
e. Water Truck
9. Average output of one gang
For Sub-grade preparation 2,400 m2/day
a. Road Grader
b. Vibratory Roller
c. Water Truck
10. Average output of one gang
For Agg. Sub-base course 300-400 m3/day
a. Road Grader flat = 400 m3/day
b. Road Roller rolling = 350 m3/day
c. Water Truck mountainous = 300 m3/day

Why is this page out of focus?

This is a Premium document. Become Premium to read the whole document.

Why is this page out of focus?

This is a Premium document. Become Premium to read the whole document.

Why is this page out of focus?

This is a Premium document. Become Premium to read the whole document.

Why is this page out of focus?

This is a Premium document. Become Premium to read the whole document.

Why is this page out of focus?

This is a Premium document. Become Premium to read the whole document.

Why is this page out of focus?

This is a Premium document. Become Premium to read the whole document.